Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 79

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

78

SAS Link and Transport Layer Test Suite v0.13

Test 7.4.1 - Closing SSP Connections – DONE (NORMAL)

Purpose: To determine that the DUT properly responds when DONE is received.

References:

7.16.6 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 13, 2004

Test Setup: The DUT and the Testing Station are physically connected.


Test Procedure (Initiators):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is an initiator the Testing Station should transmit an Identify Address
frame indicating that it is a target.

• Wait for the DUT to open an SSP connection to the Testing Station. Allow the DUT to transmit a SCSI

Command to the Testing Station, then close the connection.

• The Testing Station should transmit an OpenAddress frames to the DUT with a correct destination

SAS Address.

• Wait for the DUT to transmit OPEN_ACCEPT and RRDY.

• The Testing Station should transmit DONE (NORMAL).


Observable Results: Verify that the DUT transmitted DONE (NORMAL) within 1 msec of receiving DONE
(NORMAL) from the Testing Station.

Advertising