Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 28

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

27

SAS Link and Transport Layer Test Suite v0.13

Test 7.4.4 - Closing SSP Connections – CLOSE (NORMAL)

Purpose: To determine that the DUT properly responds when CLOSE (NORMAL) is received.

References:

7.12.7, 7.16.6 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 13, 2004

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (Targets):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.

• The Testing Station should open an SSP connection to the DUT. Wait for the DUT to transmit

OPEN_ACCEPT. The Testing Station should transmit a CLOSE (NORMAL) primitive to the DUT.


Observable Results: Verify that the DUT transmitted CLOSE (NORMAL) within 1 msec of receiving CLOSE
(NORMAL) from the Testing Station.

Advertising