Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 41

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

40

SAS Link and Transport Layer Test Suite v0.13

Test 9.3.4 - SSP Data IU – NUMBER OF FILL BY

TES ZERO


Purpose: To determine that the DUT, an SSP Target port, properly sets the NUMBER OF FILL BYTES field when
transmitting DATA frames.

References:

9.2.2.4 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator.

Revision History: February 7, 2005

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (SSP Target):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.

• The Testing Station should open an SSP connection to the DUT and transmit a SCSI READ_BUFFER

command for 1539 bytes. Close the connection

• Allow the DUT to open an SSP connection to the Testing Station and transmit DATA frames and a

SCSI response frame to the received command.

Observable Results: Verify that if the DUT sets the NUMBER OF FILL BYTES field to zero in a DATA frame,
the DUT continues to transmit DATA frames for that command.

Advertising