Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 90
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
89
SAS Link and Transport Layer Test Suite v0.13
Test 9.1.1 - SSP Frames Structure – Hashed Address
Purpose: To determine that the DUT properly calculated a hashed destination SAS address based on the sas address
provided in a received Identify Frame.
References:
4.2.3, Annex D SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator. SAS Target.
Revision History: September 23, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (Initiators):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is an initiator the Testing Station should transmit an Identify Address
frame indicating that it is a target. The SAS address provided in the Identify Frame should be
7FFFFFFFFFFFFFFFh.
• Wait for the DUT to open an SSP connection to the Testing Station. Allow the DUT to transmit a SCSI
Command to the Testing Station.
Observable Results: In each case verify that the DUT transmitted an SSP frame (command or response) with a
hashed destination SAS address of 000000h.