Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 172

Advertising
background image

University of New Hampshire

InterOperability Laboratory

incorrect parity bit. The DUT is expected to transmit it's Phy Capabilities Bits.

Observable Results

The DUT should wait 1 Hot-plug timeout period and then transmit COMINIT to the
testing station.

Possible Problems

None.

UNH-IOL

SAS 2.0 Speed Negotiation

36 of 49

Advertising