Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 172
Advertising
University of New Hampshire
InterOperability Laboratory
incorrect parity bit. The DUT is expected to transmit it's Phy Capabilities Bits.
Observable Results
●
The DUT should wait 1 Hot-plug timeout period and then transmit COMINIT to the
testing station.
Possible Problems
●
None.
UNH-IOL
SAS 2.0 Speed Negotiation
36 of 49
Advertising