Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 160

Advertising
background image

University of New Hampshire

InterOperability Laboratory

If the DUT participated in SNW-1, then verify that 11.733 µs from the beginning of the
first COMWAKE signal transmitted as part of SNW-3, a COMWAKE signal is
transmitted, indicating support for G1 WITHOUT SSC .

Possible Problems

None.

UNH-IOL

SAS 2.0 Speed Negotiation

24 of 49

Advertising