Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 95

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

94

SAS Link and Transport Layer Test Suite v0.13

Test 9.3.1 - SSP Data IU – TPT TAG First Burst Data

Purpose: To determine that the DUT, a SAS Initiator, properly sets the TARGET PORT TRANSFER TAG field
when sending First Burst Data.

References:

9.2.1 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator. The DUT will need to have software capable of
generating SCSI traffic.

Revision History: April 11, 2005

Test Setup: The DUT and the Testing Station are physically connected. The SAS Initiator DUT is attached to the
SAS Target through a SAS Protocol analyzer.

Test Procedure (SSP Initiators):

• Allow the DUT to open a connection to the attached SAS target and transmit a WRITE command with

First Burst data. The Testing Station should transmit XFER_RDY in response.

Observable Results: Verify that the TARGET PORT TRANSFER TAG field is set to FFFFh in all First Burst
DATA frames sent by the DUT.

Advertising