Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 163
Advertising
University of New Hampshire
InterOperability Laboratory
●
If the DUT participated in SNW-2, then verify that 14.666 µs from the beginning of the
first COMWAKE signal transmitted as part of SNW-3, a COMWAKE signal is
transmitted, indicating support for G2 WITHOUT SSC .
Possible Problems
●
None.
UNH-IOL
SAS 2.0 Speed Negotiation
27 of 49
Advertising