Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 163

Advertising
background image

University of New Hampshire

InterOperability Laboratory

If the DUT participated in SNW-2, then verify that 14.666 µs from the beginning of the
first COMWAKE signal transmitted as part of SNW-3, a COMWAKE signal is
transmitted, indicating support for G2 WITHOUT SSC .

Possible Problems

None.

UNH-IOL

SAS 2.0 Speed Negotiation

27 of 49

Advertising