Electrical installation − EMS version

Installation according to EMC (installation of a CE−typical drive system)

Wiring

7

l

115

EDS84DPS424 EN 5.0

7.4.4

Wiring

Notes on the laying of cables:

ƒ

In the case of greater cable lengths, a greater cable distance between the cables is
required.

ƒ

In the case of parallel routing (cable trays) of cables with different types of signals,
the degree of interference can be minimised by using a metallic cable separator or
isolated cable ducts.

Cover

Barrier without
opening

Power cables

Signal cables

EMVallg001

Fig. 7−3

Cable routing in the cable duct with barrier

Cover

Communication cables

Cable duct

Measuring cables
Analog cables

Control cables

Power cables

EMVallg002

Fig. 7−4

Cable routing in separated cable ducts