Rockwell Automation 1407-CGCM Combination Generator Control Module User Manual

Page 120

Advertising
background image

120

Rockwell Automation Publication 1407-UM001G-EN-P - April 2013

Chapter 5

CGCM Unit Startup

PF Control

Perform this test with the generator operating in parallel with a large power
source that is maintaining constant voltage.

Follow these steps to test the PF control operation.

1.

Place the voltage control in Droop mode.

2.

Adjust the prime mover to produce a constant power of approximately
25% of rated output.

3.

Verify that the PF setpoint is adjusted to the measured PF.

Be prepared to transfer back to AVR Droop mode if the excitation
increases or decreases suddenly.

4.

Transfer to PF Control mode.

5.

Monitor the exciter field current and metered PF to determine
performance during the following step.

6.

Perform a 0.10 step of the PF setpoint and observe the response of the
automatic PF control.

Adjust gains as required to achieve the desired result, and run the test
again.

Real Power Load Sharing Operation

Perform this test with two machines connected in parallel.

Follow these steps to test the Real Power Load Sharing operation.

1.

Place one prime mover in constant-speed control, and the other in manual
load control (typically droop).

2.

Adjust the load to a reasonably balanced condition by adjusting the speed
setpoint of the droop machine.

3.

Enable the real load sharing function on both machines.

4.

Switch the droop machine to constant speed control and observe the real
power and load share error reported from the CGCM unit on each
machine.

5.

Verify that the real power balances between the two generators as required
and that the load share error from each CGCM unit approaches zero.

6.

Adjust load share rate and limit as required to provide stable load share
operation.