FUJITSU CentricStor V3.1D User Manual

Page 292

Advertising
background image

292

U41117-J-Z125-7-76

History data

Global Status

Otherwise the status of the reorganization of the physical volume group(s) is displayed:

Meaning of the entries:

no.

Line number

LV

Name of the logical volume

state

Status of the reorganization:

done

Completed

failed

Aborted; can only occur with runs started manually

initiated

Job sent to VLM

restoring

Being moved back to the cache

restore done Moved back to the cache; rewriting has not yet started
saving

Being written to tape

start

Not yet started

retry

Number of command retries; after more than 2 the job is aborted.

timestamp

Time at which the current status was entered.

The number specified in the retry column also relates to command retries at the PLM-VLM
interface. If the high load on the VLM means that a PLM request could not be satisfied within
this time limit, the job is issued again.

Retries are alarming only if a particular PV is repeatedly connected with a large number of
retries. In this case the logical volumes on the PV must be moved and the PV must be
removed (see the

section “Physical Volume Operations » Erase Physical Volumes” on

page 226

).

Advertising