3 inspection and maintenance, 1 inspection, 2 maintenance – KEYENCE Visual KV Series User Manual

Page 102

Advertising
background image

Chapter 2 System Installation

1-78

2

Visual KV

Series

2.3 Inspection and Maintenance

CAUTION

2.3

Inspection and Maintenance

This section describes the inspection and maintenance procedures for units.

2.3.1

Inspection

While basic units and other units have been used for a long period of time, the
connector connection area may become loose, the battery may wear out, or another
nonconformity may occur in operation.

To avoid any nonconformities, inspect the basic units, other units, and the wiring
periodically.

The major inspection items are as follows.

Check to ensure that the connector connection area is not disconnected or loose.

Check to ensure that terminals on terminal blocks are not loose.

Check to ensure that the wiring cables among units and each equipment are not
damaged.

2.3.2

Maintenance

While basic units and other units have been used for a long period of time, dirt will
adhered. Wipe off any collected dirt with a clean, dry cloth.
Wipe off any dust and dirt that has collected on small and narrow portions with
cotton swabs.

Be sure to turn off the power before starting any inspection or maintenance of
the units.

KVHKA Chap 02.p65

08.3.11, 11:11 AM

78

Advertising