Panel mounting, Visual kv series – KEYENCE Visual KV Series User Manual

Page 129

Advertising
background image

Chapter 4 KV-D20 Operator Interface Panel

1-105

1

4

Visual KV

Series

4.1 Before Operation

Panel mounting

■ Precautions
•

Install the KV-D20 by holding the panel at
the front and rear sides with the unit and
mounting fixtures.
Available panel thickness: 1.2 mm to 3.0
mm

*

If your panel has a thickness of 3.0 mm
or more, contact your nearest KEYENCE
office listed at the back of this manual.

•

To ensure maintainability, operability, and ventilation, keep as much distance as
possible between the KV-D20 and the surrounding structure or components.

•

Prevent the KV-D20 from being heated by the heat released by other devices.

•

Install the KV-D20 as far as possible from devices that may generate arcs (e.g.
electromagnetic switches, no-fuse circuit breakers, etc.).

■ Mounting method
1. Cut an opening with the following dimensions in the panel to mount the KV-D20.

2. Insert the KV-D20 through the opening from the front surface of the panel.

3. Secure the KV-D20 to the panel with the mounting fixtures.

4. Tighten the screws of the fixtures. [Tightening torque: 0.2 N•m (2 kgf•cm) max.]

1.2 to 3.0 mm

105

+1
0

68

+1
0

7 6

5 4

3 2

1 0

KVHKA Chap 04.p65

08.3.11, 11:13 AM

105

Advertising