Chapter 4 KV-D20 Operator Interface Panel

1-105

1

4

Visual KV

Series

4.1 Before Operation

Panel mounting

Precautions

Install the KV-D20 by holding the panel at
the front and rear sides with the unit and
mounting fixtures.
Available panel thickness: 1.2 mm to 3.0
mm

*

If your panel has a thickness of 3.0 mm
or more, contact your nearest KEYENCE
office listed at the back of this manual.

To ensure maintainability, operability, and ventilation, keep as much distance as
possible between the KV-D20 and the surrounding structure or components.

Prevent the KV-D20 from being heated by the heat released by other devices.

Install the KV-D20 as far as possible from devices that may generate arcs (e.g.
electromagnetic switches, no-fuse circuit breakers, etc.).

Mounting method
1. Cut an opening with the following dimensions in the panel to mount the KV-D20.

2. Insert the KV-D20 through the opening from the front surface of the panel.

3. Secure the KV-D20 to the panel with the mounting fixtures.

4. Tighten the screws of the fixtures. [Tightening torque: 0.2 N•m (2 kgf•cm) max.]

1.2 to 3.0 mm

105

+1
0

68

+1
0

7 6

5 4

3 2

1 0