GE Industrial Solutions ASTAT BP User Manual

Page 59

Advertising
background image

ASTAT BP User Manual

59

GE Industrial Solutions

©2013 GE Company All Rights Reserved

Comm. Port

Fault

Trips the ASTAT-BP if, when controlled via Profibus communication link, the

communication cable is torn or the communication from the PLC is lost.

Note that the occurrence of this fault depends on then “Watch Dog” function of

the Profibus controller.

You must reconnect the wiring and/or the communication with the PLC and wait

for a start command initiated by the PLC.

OC or wrong

CON.

Trips the soft ASTAT-BP when connected Inside Delta and Wrong connection

or if over current is detected by the ASTAT-BP.

Verify that the motor is not stalled or shorted and check cables and wiring.
Verify that motor and ASTAT-BP are connected exactly as shown in section 8.7

page 69. If the circuitry is 100% confirmed it is possible to start when

EXPAND

SETTINGS is set to Enabled (refer to section 4.7.6 page 36). If a fault occurs

again consult the factory. The operator is advised to try operating one time only.

Note that it is useless to try starting in this mode more than once.


Note 1: When operating in

D.Set: Generator Parameters, Shorted Scr and Wrong Connection

faults are not active.

If required, these faults may be eliminated by implementing D.Set: Generator Parameters.

Refer to section 8.4 page 61 for setting the ASTAT-BP in

D.Set: Generator Parameters wiring.

88..

APPLICATION DIAGRAMS

88..11

Standard wiring

Advertising