6 other operations for the hartconfiguration tool – Yokogawa ADMAG AXR User Manual

Page 109

Advertising
background image

<8. OPERATION VIA HART CONFIGURATION TOOL (HART 5)>

8-7

IM 01E30D01-01EN

b. Confirm the new HART protocol revision

number

Call up the

Universal rev parameter, and confirm

that the new HART revision number is displayed.

• Procedure to call up the

Universal rev.

parameter.

DD

Device Setup → Detailed setup

→ Device information → Field

device information → Revision #’s

→ Universal rev →

DTM

Configuration → HART →

Universal rev. →

5

HART protocol revision: 5

7

HART protocol revision: 7

HART protocol revision can also be confirmed on

the second line and third line of the device display.

• Procedure to call up the

Display Select

Second

line

DD

Device setup → Detailed setup →

Function Set → Display → Display

Select2

DTM

Configuration → Display Set →

Display Select2

Third

line

DD

Device setup → Detailed setup →

Function Set → Display → Display

Select3

DTM

Configuration → Display Set →

Display Select3

Protocol Revision

Displayed on AXR screen

HART Protocol Revision 5

HART5

HART Protocol Revision 7

HART7

8.8.6 Other operations for the HART

configuration tool

Regarding other operations for the HART

configuration tool, refer to the HART configuration

tool operations manual.

Advertising