Yokogawa ADMAG AXR User Manual

Page 143

Advertising
background image

<11. MAINTENANCE>

11-3

IM 01E30D01-01EN

(3) Assembling the Display Unit
(1) Align the display unit in a straight with its

connector located its backside facing the

connector of amplifier assembly and then make

the required connection.

(2) Secure the display unit using its four mounting

screws.

F1104.ai

Figure 11.2.2 Removing and Assembling the Display

Unit

NOTE

Secure to display unit steadily when attaching to

the amplifier assembly.

The instrument may damage caused by

vibration of piping, etc… under its operation if the

screwing up work was not enough.

(4) Changing the Display Unit Orientation 90

Degrees

(1) Hold the display unit with your hand and

remove the four mounting screws.

(2) Remove the display unit carefully in a straight

without damaging the connector located its

backside.

(3) Turn the display unit 90 degrees clockwise and

confirm the assembling position.

(4) Align the display unit in a straight with its

connector located its backside facing the

connector of amplifier assembly and then make

the required connection.

(5) Secure the display unit using its four mounting

screws.

F1105.ai

Turn the display

unit 90 degrees

clockwise

Figure 11.2.3 Assembling the Display Unit

NOTE

Secure to display unit steadily when attaching to

the amplifier assembly.

The instrument may damage caused by

vibration of piping, etc… under its operation if the

screwing up work was not enough.

(5) Installing the Cover
(1) Install the cover to the flowmeter by turning it

in the direction of the arrow as shown below.

Tighten cover locking screws counterclockwise

using a hexagonal wrench (nominal size 3) to

lock the cover (in case of explosion proof type).

F1106.ai

Cover locking

screws

Front

side

(1)

(2)

Explosion proof type

Both Explosion proof and

General purpose types

Figure 11.2.4 Installing the Display Cover

Advertising