Revision information – Yokogawa ADMAG AXR User Manual

Page 194

Advertising
background image

i

IM 01E30D01-01EN

Revision Information

Title

: AXR Magnetic Flowmeter Integral Flowmeter

Manual No. : IM 01E30D01-01EN

Edition

Data

Page

Revised Item

1st

Sep. 2009

New publication

2nd

Nov. 2010

1-2

(3), (4)

Added the sentence.

3-1

(3)

Added the sentence.

3-7 to 3-12

Added the Torque Value of size 150 to 200 mm.

Added the Centering Device Idenfication of size 150 to

200 mm.

Added the Inner Diameters of Grounding

Ring and Outer Diameter for Effective

Sealing of size 150 to 200 mm.

4-2

4.3

Changed the sentence of Wiring Ports.

4-6

(1)

Added the note of HART protocol.

5-1

Added the sentence

8-5

8.4.6

Corrected the HART protocol parameter attribute.

11-1 to 11-22

Added the sentence of size 150 to 200 mm.
Added the note of OPTIONAL SPECIFICATIONS
Added the Flange material

Added optional code PM

Changed the Selectable range of flow rate span in the

optional code SC.

12-1

(1)

Added AXR150G and AXR200G.

13-1 to 13-4

Changed the item name in Technical Data.

3rd

Aug. 2012

1-1

Changed the style. Changed the Note.

4-1 to 4-15

Changed the Terminal Configuration.
Added the Terminal Configuration.

4-6

Changed the Supply Voltage.
Added the Connection Device (JUXTA VJA7)

6-3, 6-11

B41, H11

Added "Long Tag No (Hi)" and "Long Tag No (Lo) to Data range.

6-6, 6-22

D13

Changed the default value and the setting value.

6-7, 6-24

E13

Changed the default value and the setting value.

6-12, 6-32

J10

Changed the default value and the setting value.

6-46

Added "93:Dcv Sim Wng".

6-46

Added "NE-107"

8-1 to 8-17

8.

Changed HART 5 by the device revision up.

9-1 to 9-18

9.

Added HART 7.

12-1

Changed the Supply Voltage.
Added the Connection Device (JUXTA VJA7)

12-2

Added HART 7.

12-3

Added NE-107

12-3, 12-12

Changed the current output value in case of Style 2 with

optional code C1.

12-3

Changed the default value and the setting value of Low out

12-5 to 12-7

Changed the Accuracy.

12-6

Added SIL Certification.

12-1 to 12-21

12.

Added AXR 150C and AXR200C.

14-1 to 14-10

14.

Added AXR 150C and AXR200C.

A1-1 to A1-3

Appendix 1. Added "Safety instrumented System Installation"

Advertising