Workstation operation, 1 operation as st5010 – cv5030 workstation, Operation as st5010 – cv5030 workstation – Leica Biosystems CV5030 User Manual

Page 72

Advertising
background image

72

Instructions for Use V 3.0 RevE – 04/2013

6.

Workstation operation

6.1 Operation as ST5010 – CV5030 workstation

Both instruments are connected to each other

via a TS5015 Transfer Station.

• Specimen slide holders (77) are conveyed from

the unload station (75) into the transfer station

by a transfer arm (76).

• The message "STAINER PROC." appears on

the display.

Fig. 41

75

76

77

• Afterwards, the specimen slide holder is trans-

fered to the CV5030, placed in the loading bath

and processed.

After the coverslipping operation, the empty

specimen slide holder is transferred back onto

the discharge chute of the transfer station. The

display shows "READY".

• If the discharge chute is already occupied

with two empty specimen slide holders, an

additional "TS FULL" message is shown in the

display of the CV5030.

• With a third specimen slide holder, the dis-

charge chute is completely occupied and

the robotic coverslipper emits a signal tone,

accompanied by the messages "TS FULL" and

"PAUSED". The robotic coverslipper is now

in pause mode. The specimen slide holders

now have to be removed, as otherwise work

cannot continue. To do so, confirm the signal

tone with the RESPOND button.

78

You have the ability to connect the robotic coverslipper to a Leica ST5010 (Autostainer XL) or

ST5020 (Multistainer) staining machine to create a workstation.

Make sure that the connection be-

tween the staining and coverslipping

machine is made using the interface

cable included in the standard scope

of delivery. In addition, when program-

ming the staining protocols, "EXIT"

must be entered as the last step. If you

do not observe this, the specimen slide

holders will NOT be transfered into the

coverslipper automatically.

Advertising