Flyingsaw, Commissioning the "(flying saw) – Lenze EVS93xx FlyingSaw User Manual
Page 63
Advertising
FlyingSaw
Commissioning the "(Flying Saw)"
Prepared Solution Servo PLC / ECSxA 1.1 EN
page 4-50
Allocate the parameter file (GDC file) by clicking the GDC parameter set file icon in the column on the left:
This step is called for operating the GDLoader. The scope of supply of the Prepared Solution does not include
a GDC file
Start the download to the servo axis by clicking the Download icon:
Step 8
Step 7
Allocate the prepared parameter set (GDC files):
File types for which you have already made an allocation
are shown red and crossed out.
You can undo the allocation by clicking the crossed-out
icon again.
Advertising