Chapter 6: commissioning and operation, Checking the installation, Chapter 6 — commissioning and operation – Rockwell Automation 825 Smart Motor Manager User Manual User Manual

Page 120: Commissioning and operation, Chapter

Advertising
background image

Publication 825-UM001B-EN-P January 2001

Chapter

6



Commissioning and Operation

Checking the Installation

Careful, correct commissioning of the Bulletin 825 Smart Motor Manager is an important
prerequisite for reliable protection of the motor and economic operation of the installation.
Follow the procedures in this section to ensure that programming and setup are correct.

Current Converter (Cat. No. 825-MCM)

Verify that the device’s current range lies within the full load or the service current

Primary Current Transformer (if used)

The transformer rating must be greater or equal to the full load or the service
current.

The current ratio must be ___ A/1 A or ___ A/5 A for use with Cat.
No. 825-MCM2 or 825-MCM20 current converters, respectively

Core Balance Current Transformer

Verify that the output current of the core balance current transformer is
5…500 mA for the alarm or trip signal.

Basic Unit (Cat. No. 825-M…)

Verify that the power supply voltage has been properly selected for the control
circuit voltage.

Verify that the appropriate option cards have been installed.

Verify that the indication meter (if required) is connected.

ATTENTION

!

Checking and commissioning must be carried out only by qualified
personnel. Disconnect the main switch and isolate the control circuit
before commissioning or installing the unit.