2 - commissioning procedure, Preliminary set-up, Chapter 2 – Rockwell Automation 7763 Medium Voltage OneGear SMC Flex Motor Controller (10-15 kV) User Manual
Page 47: Commissioning procedure, Chapter
Advertising
Rockwell Automation Publication 7760-UM001D-EN-P - October 2014
47
Chapter
2
Commissioning Procedure
Preliminary Set-Up
A.
Ensure the work area is clean and tidy. Pathways to main disconnect and
emergency stop push-button must be clear and unobstructed.
B.
The following test equipment is to be prepared for use:
•
Test power supply, supplied with each controller
•
Multimeters
•
Hi-Pot Tester (recommended) or Megger
•
Oscilloscope with memory (optional)
C.
Complete drawing package and parts list.
D.
Specification of project.