GE Industrial Solutions Galaxy Pulsar Edge User Manual

Page 30

Advertising
background image

Galaxy Pulsar Edge Power System Controller


Issue 3 October 2011

30

Locate and place the Pulsar Edge into its
allocated position located to the left of the
left-most rectifier slot. Although the
physical configuration of the controller is
different for the various product lines, the
controller is located in a similar location.

7

Hold the controller by the controller’s
chassis using the edges of the sheet metal
to support the insertion.

8

Push the controller firmly into the shelf
using the handle provided. The LCD
assembly can be used on those. Do not
press
on the LEDs or LCD glass to insert
the controller into the shelf. Simultaneous
pressing on the DB-9 connector to insert
the controller into the shelf is permissible.

Advertising