Check control point screen – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 204

Advertising
background image

Survey Pro Reference Manual

R-196

Projection : opens the Projection screen (Page R-204).

View Points : opens the View Coordinates File screen, where the

project points can be examined.

Post Process : opens the Receiver Session screen (Page R-202), where

you can occupy a point for a post processing only session. This allows
you log a session in the post processing file using an existing point

name without changing that point record in the job file.

Check : opens the Check Control Point screen, where the local

coordinate computed from the measurement is compared to the local

coordinate’s known value.

Control : opens the Occupy Control Point screen, where geodetic

coordinates are measured at a point with local coordinates and added
to that point record in the job file.

Check Control Point Screen

Survey Control Points

Check Point

.

or Data Collection Control Check Point

.

The Check Control Point screen is used to check a control point. This

is done when you want to verify the quality of the coordinate system
solution.

Coordinates

: displays the local coordinates

computed using the current measurement and
the latest projection solution.

Solution

Quality: displays the quality of the

current measurement: the solution type, the
number of satellites used, and the horizontal

and vertical precision computed by the

receiver. These values are explained with the
GPS Status screen (Page - R172)

Errors

: displays the differences between the

computed local coordinates and the known

coordinates for the control point.

Advertising