Leveling stakeout – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 273

Advertising
background image

Level Menu

R-265

Leveling Stakeout

Leveling Level

Stakeout >

.

The Leveling Stakeout screen is used to measure the elevation at an

existing point and compute a cut/fill value.

Stk Point: is the point in the current job that

you want to shoot to determine the cut/fill
value. (The location for this point must be

known in advance since the leveling routine

cannot compute horizontal coordinates.)
Backsight Point: Lists the details for the

current backsight. If this is the first
observation from the current set up, most of the

details will be unknown.

Next > : opens the Take Shot screen (Page R-

262) where the required shots are performed.

Advertising