Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 211

Advertising
background image

Survey Menu – GPS Module

R-203

Note: If you are storing this point in Survey Pro, the screen will look
like the picture above, and you can pick points using the Survey Pro

compound point control. If you choose an existing point, you will be

prompted to rename or overwrite, just like RTK data collection. If
you are storing this point in the receiver file only, then the point

control is replaced with a simple edit box. When storing to receiver
only, you can reuse an existing point name without modifying that
point in the Survey Pro job file.

Description

: is where you enter the description for the static session

or stop and go point.

Log Until Stop

: is where you select to use a Duration or to record until

Stop is tapped.

Duration

: is where you enter the session length for the next

occupation.

Set HR : displays the current antenna measurement and measure to

setting. You can change the antenna measurement by entering a new

value in the edit box. This new antenna height will be sent to the
receiver with your next control or check point collection. You can

change both the antenna measurement and measure to setting by
tapping on Set HR to open the Receiver Antenna screen (Page R-184).

Note: The Set HR button is only available if this is a stop and go
post processing session, or an RTK rover session.

Start : sets the receiver to mark the beginning of a static point

occupation with the entered Site ID and Description.

Stop : sets the receiver to mark the end of a static point occupation.

Status : opens the GPS Status screen (Page R-172).

Advertising