Slope staking – screen three – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 302

Advertising
background image

Survey Pro Reference Manual

R-294

cause water to run from the centerline toward the edge.)

; Stake Curb / Ditch

: When checked, this allows you to include a

curb or ditch in the road profile.
Height: defines the height of the curb, or depth of the ditch. (A
negative value would be used to define the depth of a ditch.)
Offset From Edge of Road: defines the width of the curb or ditch.

< Back : returns to the previous screen.

Next > : opens the next screen.

Slope Staking – Screen Three

Station to Stake: is the station that will be

staked next.
Station Interval: is the value that is added to
the Station to Stake after the Next Station
button is pressed.

Next Station : advances the Station to Stake by

the Station Interval.

Note: If the Stake Corners option is selected in the Stakeout Settings
screen, the Next Station button will also stop at any horizontal or
vertical alignment node that falls within the interval.

Fill Slope: is the desired slope, calculated from rise over run, between
the hinge point and catch point when the area requires a fill.
Cut Slope: is the desired slope, calculated from rise over run,
between the hinge point and catch point when the area requires a cut.
Segment # (Fill HP): when the terrain requires a fill, you have the
option to compute the hinge point from either side of the second
segment. The option to use segment # 1 can simplify the situation