Offset staking – screen three – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 296

Advertising
background image

Survey Pro Reference Manual

R-288

Note: The specified curb or ditch height and offset will be applied to
both sides of the road.

< Back : returns to the previous screen.

Next > : opens the next screen.

Offset Staking – Screen Three

The third Offset Staking screen is used to select the station and
section of the road to be staked and to specify an offset distance from

the design point.
Stake Station: is the station to be staked.
HR: is the rod height.
Interval: Specifies how far to advance from the
current station to the next station.

Next Sta : advances the current station by the

Station Interval

.

Note: When advancing, if you want to also

stake the locations where the alignment of the

road changes, be sure to check the Stake
“Corners”, Not Just Even Intervals

option in the Stakeout Settings card.

Tapping the button will access the Stakeout Settings.

<< / >> : These buttons are used to select the section of the road

that you want to stake.

; Offset

: When checked, is the offset distance that will be applied to

the selected design point. A positive offset extends from the design
point away from the centerline. A negative offset extends towards

the centerline.
Subgrade
: When checked, allows you to specify a vertical offset from
the actual node locations. Positive values result in the stake location

Advertising