Station staking – screen two, Station staking – screen three – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 334

Advertising
background image

Survey Pro Reference Manual

R-326

Station Staking – Screen Two

Stakeout Station Staking Next >

.

The second Station Staking screen is used to configure which Station,

Surface, and Offset you want to stake.

Use the corresponding

and

buttons to

scroll the available Station, Surface, and Offset
that you want to stake.
Height of Rod: is the rod height.

Backsight… : opens the Backsight Setup screen

(Page R-118) where you can set your backsight.

< Back : returns to the previous screen.

Solve > : opens the next Station Staking

screen.

Station Staking – Screen Three

Stakeout Station Staking Next > Solve >

.

The third Station Staking screen shows the direction and distance

information from the instrument to the selected stake point.

The Station, Surface, and Offset information is
displayed at the top of the screen.
From Gun to Design Point: lists the direction

and distance information used to aim the total
station toward the stake point.

Circle Zero : is used to modify the circle on the

total station so that the angle right reading
will be zero when it is facing toward the design

point, which can sometimes be easier than
turning to an obscure angle value. When this

button is tapped, the following actions will

occur:

Advertising