Post processing, Projection, Check control point screen – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual

Page 263: Occupy control point screen

Advertising
background image

Survey Menu – Basic GPS Module

R-255

Check Control Point Screen

Survey Control Points

Check Point

.

or

Data Collection Control Check Point

.

The Check Control Point screen is used to check a control point. This
is done when you want to verify the quality of the coordinate system

solution and is described on Page R-196.

Occupy Control Point Screen

Survey Control Points

Control

.

or

Data Collection Control Control

.

The Occupy Control Point screen is used to add geodetic coordinates
to a known project point. The most common use of this screen is to

measure control points for the localization solution and is described

on Page R-197.

Post Processing

Survey Post Processing

.

Post processing data collection involves two steps. First, you must

open a file and begin logging GPS raw data for post processing.
Second, you must measure the antenna height and enter the antenna

and station ID for each point you occupy. The Post Processing

routine is described, starting on Page R-199.

Projection

Survey Projection

.

The Projection Information screen is used to select and solve the

horizontal and vertical projections, which are used to transform GPS
measured WGS84 coordinates (latitude, longitude, height) into local

coordinates (North,East,Elevation). The screen is also used to switch

Advertising