What's inside the Box

Opening the box you should find the following items:

DIVA slave Unit Rack rounting brackets, 2 pcs.

Metal screws Philips M3x6, 6 pcs. 12-way euroblock connectors, 1 pcs.

10-way euroblock connectors, 3 pcs.

4-way euroblock connector, 10 pcs.

10-way mini euroblock connectors, 1 pcs.

2-ways mini euroblock connector, 1 pcs.

230 VAC power cable.

If you realize anything missing, please contact your distributor.

4.1.2.3

Installation

In the Box of the DIVA there is containing a letter with a point by point instruction that need to be
followed for safety reasons.

Rack mounting:

If needed, fit the rack mounting brackets to each side of the DIVA by using the 6 pcs Phillips M3x6
screws supplied with the package.

Sitting:

The DIVA unit takes a 2U 19’’ rack space and generates little heat itself. Consider leaving enough
ventilation space above and below the unit. Do not mount the DIVA directly above heat generating
devices like power supplies or power amplifiers.

Power connection:

DIVA accepts 24 VDC power supply as well as 230 VAC power supply. In order to be EN54
compliant, use a BECs battery charger and power supply and connect it on a 4-way euroblock
connector respecting the polarity.