12-11

Built-in clock adjustment

Figure 12-4.

Example:

A: 2 digits of calendar year

1993 ……………………93

B: Month

April ……………………04

C: Day

5th day …………………05

D: Hour (24 hour system)

3PM ……………………15

E: Minute

6 minutes ………………06

F: Second

Not changeable

NOTE

1.

,

,

,

, keys

are used to change the values, and

ENTER key

is used to store

the values.

2. Clock is still progressing the operation even after the calibration step is moved to this

built-in clock adjustment item. After entering the changing mode by

ENTER key

,

the clock stops.

3. After pressing

ENTER key

, the clock starts from 0 second.

4. Writing to EEPROM is not necessary.

PV calibration

Scroll

,

,

,

, keys

to show (

1011

) on upper display, then press

ENTER key

.

Input CH No. select

Press

SETUP key

until the PROG/SEG display shows (

01-01

).

Input the channel No. by

,

,

,

, keys

(

ENTER key

not required).

Table 12-8.

Gain No. select

Press

SETUP key

until the PROG/SEG display shows (

01-02

). Connect calibration

device (See Section “

12-3 Set Up

”).

Input the gain number (See Table 12-9 and Table 12-10) by scrolling

,

,

,

, keys

the upper display (

ENTER key

not required).

CH No.

Upper Display

1

0 0 0 0 0

0 0 0 0 1

2

CYC

OUT

DEV

PV

SP

TM

SYN

PROG

SEG

.

-

)

*

+

,