8 installing optional smb wiring, 9 preparing for installing optional accessories, 10 initial startup – Powerware 9315s User Manual

Page 34: 11 completing the installation checklist

Advertising
background image

2--6

Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM

164201373 Rev. A

092402

2.8

Installing Optional SMB Wiring

NOTE: Refer to section 1.1.4 for additional guidance for wiring and conduit

installation.

NOTE: For SMB with100 kAIC short circuit rating, power rating must be secured as

shown in drawing 164201373---1.

Install power wiring to the SMB and between the SMB and critical load. Refer to

Appendix A of this manual for wiring and termination requirements and wiring access

information.

2.9

Preparing for Installing Optional Accessories

If you are installing optional accessories, such as a

Remote Monitor Panel (RMP),

a Relay Interface Module (RIM), a Supervisory Contact Module (SCM), or a Remote

Emergency Power Off (EPO), you must install conduit between each device and the

UPS cabinet for wiring these options. Refer to Appendix A for the locations of the

interface points within the SSBM cabinet.

To prepare the SSBM for wiring to an RMP, RIM, SCM, or Remote EPO:

1.

Be sure the Parallel Capacity/Redundant system is turned off and all power

sources are removed. (See the operation section of this manual for shutdown

instructions.)

2.

Remove the access plate on top of the SSBM control section to gain access to

the Customer Interface Panel (refer to Appendix A for location of the access

plate).

3.

Refer to Chapters 3, 4, 5, or 6 as applicable for installation instructions.

2.10

Initial Startup

Startup and operational checks should be performed only by authorized service

personnel. Contact service in advance (usually a two week notice is required) to

reserve a preferred startup date.

2.11

Completing the Installation Checklist

The final step in installing your Parallel Capacity/Redundant system is completing

the following Installation Checklist. This checklist ensures that you have

completely installed all hardware, cables, and other equipment. Completing all

items listed on the checklist will ensure a smooth installation. You should make a

copy of the Installation Checklist before filling it out, and retain the original.
After your installation is complete, a service representative will be able to verify the

operation of your Parallel Capacity/Redundant system and commission it to

support your critical load. The service representative cannot perform any

installation tasks other than verifying software and operating setup parameters.

Service personnel may request a copy of the completed Installation Checklist to be

sure you have completed all applicable equipment installation.
NOTE: The Installation Checklist MUST be completed prior to starting the Parallel

Capacity/Redundant system for the first time.