Powerware 9315s User Manual

Page 42

Advertising
background image

4--4

Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM

164201373 Rev. A

092402

4.

Connect RMP wiring to the terminal block using terminations shown in

Table 4---2.

Table 4---2. RMP Wire Terminations

From RMP A

To SSBM

Remarks

TB1---4

TB3---1

TB1---5

TB3---2

TWISTED WIRES (4)

1 2 TURNS PER

TB1---6

TB3---3

1---2 TURNS PER

3 INCHES

TB1---7

TB3---4

3 INCHES

From RMP B (if used)

To SSBM

Remarks

TB1---4

TB3---5

TB1---5

TB3---6

TWISTED WIRES (4)

1 2 TURNS PER

TB1---6

TB3---7

1---2 TURNS PER

3 INCHES

TB1---7

TB3---8

3 INCHES

5.

To check the operation of the RMP, ensure that the Parallel

Capacity/Redundant system is supplying the load via the inverters or bypass.

If the indicators on the RMP show the appropriate status, then it is operating

correctly.

If the communications link between the SSBM and the RMP is not present, the

RMP will self-test (all indicators flash and the horn beeps at one-second

intervals). If this occurs, check all harness connectors and the fuse for proper

seating. If all connections are secure but the RMP continues to self-test,

replace the fuse with the spare included in the hardware kit. If this does not

correct the problem, contact your local field service office for verification that

the RMP is working correctly.

6.

To test the indicator lamps, press the horn silence button and hold it for

3 seconds. All lamps should light, and the horn will sound continuously

until you release the button.

7.

Repeat steps 1, 2, and 4 through 6 for each RMP you are installing.

8.

If you are installing an RIM or SCM in addition to an RMP, proceed to Chapter 5

or 6, respectively; otherwise, secure the SSBM by reversing the steps

contained in procedure “To Prepare the SSBM for Wiring to an RMP, RIM,

SCM, or Remote EPO” of Chapter 2.