Path of electrical power – Powerware 9315s User Manual

Page 61

Advertising
background image

7--9

Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM

164201373 Rev. A

092402

UPM1

UPM2

UPM3

UPM4

SS

FBP

CBP

CBS

BYPASS

INPUT

OUTPUT TO

CRITICAL

LOAD

BATT

UPM

INPUT

BATT

BATT

BATT

SSBM

SMB

MIS

MBP

MAINTENANCE

BYPASS

INPUT

Path of Electrical Power

(open)

(open)

LBB

TABS

TO TEMPORARY LOAD

BANK (BY OTHERS)

TEMP.

Figure 7---5. Path of Current Through the Parallel Capacity/Redundant System

in Load Bank Mode with SSBM/SMB with Temporary Load Bank Tabs.

Advertising