7--8

Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM

164201373 Rev. A

092402

UPM1

UPM2

UPM3

UPM4

SS

FBP

CBP

CBS

BYPASS

INPUT

BATT

UPM

INPUT

BATT

BATT

BATT

SSBM

Path of Electrical Power

(open)

LBB

TABS

TO TEMPORARY LOAD

BANK (BY OTHERS)

TEMP.

OUTPUT TO

CRITICAL LOAD

Figure 7---4. Path of Current Through the Parallel Capacity/Redundant System

in Load Bank Mode with SSBM with Temporary Load Bank Tabs.