Applying power, Start-up status indications, Applying power -8 – Rockwell Automation 20-COMM-D DeviceNet Adapter Series B FRN 2.xxx User Manual

Page 26

Advertising
background image

2-8

Installing the Adapter

20-COMM-D DeviceNet Adapter User Manual

Publication 20COMM-UM002G-EN-P

Applying Power

Install the drive cover or close the drive door, and apply power to the drive.
The adapter receives its power from the connected drive. When you apply
power to the adapter for the first time, its topmost ‘PORT’ status indicator
should be steady green or flashing green after an initialization. If it is red,
there is a problem. See

Chapter 7

,

Troubleshooting

.

Start-Up Status Indications

Status indicators for the drive and communication adapter can be viewed on
the front of the drive (

Figure 2.6

) after power has been applied. Possible

start-up status indications are shown in

Table 2.A

.

Figure 2.6 Drive and Adapter Status Indicators (location on drive may vary)

!

ATTENTION: Risk of equipment damage, injury, or death
exists. Unpredictable operation may occur if you fail to verify
that parameter settings are compatible with your application.
Verify that settings are compatible with your application before
applying power to the drive.

STS

PORT

MOD

NET A

NET B

Advertising