Rockwell Automation 1747-L5xx SLC 500 Modular Hardware Style User Manual User Manual

Page 17

Advertising
background image

Publication 1747-UM011G-EN-P - June 2008

Quick Start for Experienced Users 17

2.

Install the chassis.

Reference

1. Determine the amount of spacing required for mounting your system.

Chapter 3
(System Installation
Recommendations)

C

1746-C9 Cable

SLC 500 Controller

1746-C7 Cable

D

SLC 500 Controller

SLC 500 Controller

B

C

A

B

C

A

B

B

SLC 500 Controller

SLC 500 Controller

SLC 500 Controller

A

1746-C9
Cable

1746-C9
Cable

C

Recommended Spacing

A.

15.3...20.0 cm (6...8 in.) when using the 1746-C9 cable. If you mount two 13-slot

chassis above each other, the distance cannot exceed 10.2...12.7 cm (4...5 in.).

B.

Greater than 10.2 cm (4 in.).

C.

Greater than 15.3 cm (6 in.).

D.

6.35...10.2 cm (2.5...4 in.) when using the 1746-C7 cable. If you are using a 1746-P4
power supply, your maximum spacing is 6.35 cm (2.5 in.).

B

Advertising