Install your chassis, Low voltage directive – Rockwell Automation 1747-L5xx SLC 500 Modular Hardware Style User Manual User Manual
Page 98

Publication 1747-UM011G-EN-P - June 2008
98
Installing Your Hardware Components
Low Voltage Directive
This product is tested to meet Council Directive 73/23/EEC Low
Voltage, by applying the safety requirements of EN 61131-2
Programmable Controllers, Part 2 – Equipment Requirements and
Tests.
For specific information required by EN61131-2, see the appropriate
sections in this publication, as well as the industrial Automation,
Wiring and Grounding Guidelines for Noise Immunity, publication
1770-4.1.
Install Your Chassis
The power supply support panel (left end panel) has screws as
indicated in the following illustration. The center and right end panels
are held in position by a molded latch and do not require screws.
Perform this procedure to install your chassis.
1. Drill holes in the back panel of the enclosure for chassis
mounting tabs.
Screw
Screw
Latch
Latch
Latch
Latch
ATTENTION
Be careful of metal chips when drilling mounting holes for
the SLC chassis. Do not drill holes above an SLC chassis if
a processor and I/O modules are installed.