Rockwell Automation 1747-L5xx SLC 500 Modular Hardware Style User Manual User Manual

Page 22

Advertising
background image

Publication 1747-UM011G-EN-P - June 2008

22

Quick Start for Experienced Users

7.

Apply power to the processor.

Reference

1. Energize the chassis power supply.

2. Check the chassis power supply and processor status indicators. The power status

indicator on the power supply should be on and the fault status indicator on the
processor should be flashing.

Chapter 8
(Starting Up Your
Control System)

Chapter 10
(Troubleshooting)

Power supply and SLC 5/01 and SLC 5/02 processor
status indicators

Power supply and SLC 5/03 and SLC 5/04 processor
status indicators

The RUN status indicator on the SLC 5/01
processor is actually labeled PC RUN. Also,
the SLC 5/01 processor does not have a
COMM status indicator.

The DH485 status indicator on the SLC 5/03
processor is labeled DH+ on the SLC 5/04
processor.

Power supply and SLC 5/05 processor
status indicators

Refer to the following key to determine the
status of the status indicators:

COMM

POWER

POWER

POWER

FLT

RUN

BATT

FORCE

CPU FAULT

RUN

FORCED I/O
BATTERY LOW

DH485
RS232

FLT

RUN

FORCE
ENET

BATT

Indicates the status indicator is off.

Indicates the status indicator is on.

Indicates the status indicator is FLASHING.

Status of status indicator does not matter.

RS232

8.

Load your software.

Reference

Refer to your software package’s documentation.

Advertising