Referenced worksheets – Rockwell Automation 1771-QDC, D17716.5.86(Passport) PLASTIC MOLDING MODULE User Manual

Page 159

Advertising
background image

Span Your Valves

Chapter 9

9-2

The following table lists command blocks used in this chapter and in
corresponding worksheets from chapters 7 and 8 that contain initial values.

Block:

Worksheet:

Clamp Close Profile Block (CPC)

8ĆA

Clamp Open Profile Block (OPC)

8ĆE

First Clamp Close Configuration Block (FCC)

7ĆA

Second Clamp Close Configuration Block (SCC)

7ĆB

Third Clamp Close Configuration Block (TCC)

7ĆC

Clamp Low Pressure Close Configuration Block (LPC) 7ĆD
First Clamp Open Configuration Block (FOC)

7ĆI

Second Clamp Open Configuration Block (SOC)

7ĆJ

Third Clamp Open Configuration Block (TOC)

7ĆK

Clamp Open Slow Configuration Block (OSC)

7ĆL

Injection Configuration Block (INC)

7ĆE

Injection Profile Block (IPC)

8ĆB

Pack Configuration Block (PKC)

7ĆF

Hold Configuration Block (HDC)

7ĆG

Pack/Hold Profile Block (HPC)

8ĆC

Plastication Configuration Block (PLC)

7ĆH

Plastication Profile Block (PPC)

8ĆD

ATTENTION: As with any machine start-up, install a test
mold. Programming errors, configuration errors, or hydraulic
problems could lead to machine damage or injury to personnel.

ATTENTION: Make sure all machine guards and shields are in
place before proceeding.

Important: Maintain the same initialization values that you entered in
previous chapters except where noted in the text.

Referenced Worksheets

Advertising