Hypertherm HTA Rev 6.00 Install Guide User Manual

Page 146

Advertising
background image

134

Installation & Setup Guide

3) Clamp and Unlock all carriages and G00 index inward on transverse

(optional command - may used to space all stations away from edge / OT switch of machine)

4) Lock and Unclamp all and G00 index to space first station (remember-first station has no

clamping/locking on board)























5) Unlock and Clamp next station and G00 index to space next station.






















6) Repeat 5 above until as many stations as needed are spaced.

Note: Homing will also automatically include the commands necessary to push the stations to the side
and lock / clamp them whenever the transverse is homed, if Auto Torch Spacing is enabled.
Unclamp/ Clamp and Unlock / lock commands execute a one second delay before moving.

CNC

Gantry

Cutting
Table

1

2

3

4

CNC

Gantry

Cutting
Table

3

4

1

2

Advertising
This manual is related to the following products: