Test 1 – return line -31, Test 2 – supply line at ignition console -31 – Hypertherm HPR260 Manual Gas Preventive Maintenance Program Rev.5 User Manual

Page 175

Advertising
background image

MAINTENANCE

HPR260 Auto Gas

Instruction Manual

5-31

Test 1 – return line

Note: an in-line flow meter is required to complete this test.

1. Turn OFF the power. Remove the return coolant line (blue hose with red tape),

and connect the flow meter to measure the flow rate.

2. Measure the flow rate on the flow meter. Turn ON the power. Turn ON the

pump manually using the manual pump control button on your CNC screen
(see step 1 under “Manual pump operation”). Write down the flow rate from
the flow meter.

3. Reconnect the return coolant line (blue hose with red tape).

If the flow rate is 0.8 gpm or more, go to test 7.

If the flow rate is less than 0.8 gpm, Go to test 2.

If there is no flow, go to pump and motor troubleshooting.

Test 2 – supply line at ignition console

Note: remove the torch-lead coolant hoses to acess the supply line.

1. Turn OFF the power. Remove the supply coolant line (blue hose with

green tape) from the RHF/LHF console, and place it in a 3.8 liter
(1 gallon) container. A Hypertherm coolant container works well.

2. Measure how long it takes to fill the container. Turn ON the power.

Turn ON the pump manually using the manual pump control button
on your CNC screen (see step 1 under “Manual pump operation”).
Write down how long it takes to fill the container.

3. Reconnect the coolant lines.

If the container is full in 65 seconds or less, go to test 3.

If it takes more than 65 seconds to fill the container, go to test 6.

Torch-lead
coolant hoses

5

Advertising