Preventive maintenance protocol checklist, Comments, General comments and recommendations – Hypertherm HPR260 Manual Gas Preventive Maintenance Program Rev.5 User Manual

Page 200: Cable connections, Ignition console, System grounding, Power supply, Coolant system, Torch main body, Gas flows

Advertising
background image

5-56

HPR260 Auto Gas

Instruction Manual

Gas flows – continued

Ȟ

P

Ȟ

NP

16. Perform gas leak tests

A. Oxygen pressure drop at ____________

psi in 10 minutes ( ____________ bar)

B. Nitrogen pressure drop at ____________

psi in 10 minutes ( ____________ bar)

Ȟ

P

Ȟ

NP

17. Inspect for hose restrictions

Ȟ

P

Ȟ

NP

A. Metering console hoses

Ȟ

P

Ȟ

NP

B. Selection console to Metering

console

Ȟ

P

Ȟ

NP

C. Metering console to torch

Ȟ

P

Ȟ

NP

D. Hoses in power track

Cable connections

Ȟ

P

Ȟ

NP

18. Inspect cables

Ȟ

P

Ȟ

NP

A. CommandTHC

Ȟ

P

Ȟ

NP

B. Control cable from metering

console to selection console

Ȟ

P

Ȟ

NP

C. From metering console to

power supply

Ȟ

P

Ȟ

NP

D. From ignition console and

selection console to power supply

Ignition console

Ȟ

P

Ȟ

NP

19. Inspect for moisture, dust and

particulates

Ȟ

P

Ȟ

NP

20. Inspect spark gap subassembly

Ȟ

P

Ȟ

NP

21. Inspect torch leads

System grounding

Ȟ

P

Ȟ

NP

22. Inspect for proper system component

grounding

Ȟ

P

Ȟ

NP

23. Inspect connection from cutting

table to workpiece (+) lead

Power supply

Ȟ

P

Ȟ

NP

1. Inspect for particulates and blow out

Ȟ

P

Ȟ

NP

2. Inspect wiring harnesses

Ȟ

P

Ȟ

NP

3. Inspect main contactor

Ȟ

P

Ȟ

NP

4. Inspect pilot arc relay

Coolant system

Ȟ

P

Ȟ

NP

5. Inspect filter element

Ȟ

P

Ȟ

NP

6. Perform coolant flow tes t

A. Coolant flow checked at _________

gallons per minute ( _________ l/min)

Torch main body

Ȟ

P

Ȟ

NP

7. Inspect water tube

Ȟ

P

Ȟ

NP

8. Inspect current ring

Ȟ

P

Ȟ

NP

9. Clean threads on torch front end

Ȟ

P

Ȟ

NP

10. Inspect Vespel torch insulator

Ȟ

P

Ȟ

NP

11. Inspect torch and consumable o-rings

Ȟ

P

Ȟ

NP

12. Verify proper fit of retaining or shield cap

Ȟ

P

Ȟ

NP

13. Inspect hose fittings

Ȟ

P

Ȟ

NP

14. Inspect torch-to-torch-lead connections

Gas flows

Ȟ

P

Ȟ

NP

15. Inspect plumbing from gas supply

Ȟ

P

Ȟ

NP

A. Oxygen

Ȟ

P

Ȟ

NP

B. Nitrogen

Ȟ

P

Ȟ

NP

C. Air

Ȟ

P

Ȟ

NP

D. Nitrogen-Hydrogen

Ȟ

P

Ȟ

NP

E. Argon-Hydrogen

Ȟ

P

Ȟ

NP

F. Inspect compressed air filter system

Preventive Maintenance Protocol Checklist

Customer:

Location:

Contact:

Date:

Hypertherm system:

System serial #:

System arc hours:
(if equipped with an hour meter)

Comments

P –

Performed NP – Not present on system

Preventive maintenance performed by:

Date:

General comments and recommendations:

Advertising