Port commissioning overview

14

Recommissioning an F-Port

NOTE

You must configure at least one CIMOM server (refer to

“Registering a CIMOM server”

on page 445)

before you can recommission an F-Port.

Select the F-Port, then select Configure > Port Commissioning > Recommission > Port.

While recommissioning is in progress, an up arrow icon displays next to the port icon in the Product
List. You can view the port commissioning results in the deployment reports (refer to

“Port

commissioning deployment report”

on page 453).

When the recommission is complete, an application event displays in the Master Log detailing
success or failure.

Decommissioning an E-Port

NOTE

You must enable Lossless DLS on both the source and destination switches before you
decommission an E-Port.

NOTE

Fabric tracking must be enabled (refer to

“Enabling fabric tracking”

on page 187) to maintain the

decommissioned port details (such as port type, device port wwn, and so on). Do not accept
changes in the Management application client.

Select the E-Port in the Product List, then select Configure > Port Commissioning > Decommission
> Port.

While decommissioning is in progress, a down arrow icon displays next to the port icon in the
Product List. You can view the port commissioning results in the deployment reports (refer to

“Port

commissioning deployment report”

on page 453).

When the decommission is complete, an application event displays in the Master Log detailing
success or failure.

Recommissioning an E-Port

NOTE

You do not need to enable Lossless DLS before you recommission an E-Port.

Select the E-Port in the Product List, then select Configure > Port Commissioning > Recommission
> Port.

While recommissioning is in progress, an up arrow icon displays next to the port icon in the Product
List. You can view the port commissioning results in the deployment reports (refer to

“Generating a

deployment report”

on page 1006).

When the recommission is complete, an application event displays in the Master Log detailing
success or failure.