Metrohm 711 Liquino User Manual

Page 51

Advertising
background image

3 Introduction

711 Liquino, Instructions for use

45

Various XDOS methods can be edited and stored in the method memory.
Each of these methods can then be reloaded by pressing a few keys. The
method memory is described on page 128.



Running the method

START

Z

When <START> is now pressed the display shows

Di spl ay:

Not pr epar ed yet !

Run PREP now?

ENTER

YES

Before the Dosino is used for the first time in the new configuration the

Dosino cylinder and the complete tubing system must be filled bubble-
free with the reagent solution. Press <YES>.

Di spl ay:

Put t i p i n vessel !

Run PREP?

Take care that the tip of the dosing tubing is located in a vessel and

then press <YES>. Wait until the 711 Liquino has ended the prepara-
tion (PREP). The instrument then returns to its normal state.

START

Z

From now on when <START> is pressed the method will be run im-

mediately.

*)



*) The warning about the preparation of the tubing system appears each time the mode is changed and after
the instrument has been switched off and on again. If it is certain that the Dosinos used have already been
prepared then press <NO> (<QUIT> key) to acknowledge the warning. The method can now be run in the
normal manner by pressing <START>.

Advertising