3.4.8 Schedules

The Schedules page allows users to schedule the activation and deactivation of relay outputs.

This is useful for cycling redundant equipment such as chillers, generators, etc. Relays are

assigned these schedules through the Relay Configuration menus.

Figure 3.18

Schedules Configuration Page

Option

Description

Status

A non-editable field, this will show the schedule as active or inactive

depending on the criteria you enter in the date and time fields.

Begin DOW

The day of the week the schedule will begin.

End DOW

The day of the week the schedule will end.

Begin Time

The time the schedule will begin.

End Time

The time the schedule will end.

Table 3.10