4 testing the direction of traverse – HEIDENHAIN TNC 335 Technical Manual User Manual
Page 329

4-232
TNC 360
16 Commissioning and Start-up Procedure
8/95
16.3.4 Testing the direction of traverse
Test the controls for the direction of traverse according to the following diagram (effective machine
parameters: MP210 count direction of the measuring system signals, MP1040 polarity of the
nominal value voltage, MP1320 direction of traverse on passing over the reference marks).
No
No
Yes
No
Yes
No
No
Yes
Yes
Start reference
traverse with
axis direction keys
?
(Both types of
referencing must
be performed!)
Axis traverse
direction correct?
(defined in MP1040
and MP210)
"Cross positioning error"
or incorrect
traverse direction
after passing over
ref. marks?
Line voltage on
START
Erase POWER INTERRUPTED error message with CE
Control voltage on;
axes are in the control loop
Gross
positioning error
(MP1040 or
MP210 incorrect)
?
Traverse
direction correct?
(as defined
in MP1320)
Line
voltage
off
Change
MP210
MP1040
MP1320
Reference traverse with
machine START button
Test the traverse direction of
referencing in each axis
Test the traverse direction
in each axis
This flow diagram must be worked through for every axis!