2 plc inputs/outputs on the pl 400 – HEIDENHAIN TNC 335 Technical Manual User Manual

Page 71

Advertising
background image


8/95

TNC 360

11 PLC inputs/outputs

3-47

11.4.2 PLC inputs/outputs on the PL 400

The PLC inputs/outputs on the PL 400 are distributed among nine connectors.
Assignments as follows:

X1

X2

Pin Number

Assignment
PL 400

Pin Number

Assignment
PL 400

1

O32

1

O43

2

O33

2

O44

3

O34

3

O45

4

O35

4

O46

5

O36

5

O47

6

O37

6

O48

7

O38

7

O49

8

O39

8

O50

9

O40

9

O51

10

O41

10

O52

11

O42

11

O53

12

Do not use

12

Do not use

X3

X4

Pin Number

Assignment
PL 400

Pin Number

Assignment
PL 400

1

O54

1

I126

2

O55

2

I74

3

O56

2)

3

I73

4

O57

2)

4

I72

5

O58

5

I71

6

O59

2)

6

I70

7

O60

2)

7

I69

8

O61

2)

8

I68

9

O62

2)

9

I67

10

Control is operational

10

I66

11

Do not use

11

I65

12

+24 V cannot be switched
off via ext. EMERGENCY
OFF

1)

12

I64

1) +24 V must always be connected, even if the outputs are not used.

2) Outputs cannot be switched off via EMERGENCY STOP

Advertising