B.3 baseband disconnection, Procedure, Baseband disconnection – Teledyne LeCroy Merlins Wand - Users Manual User Manual
Page 156: Click execute
Advertising
140
CATC M
ERLIN
’
S
W
AND
2.00
C
HAPTER
B
User’s Manual
Command Generator Examples
B.3 Baseband Disconnection
Procedure
In this scenario, Merlin’s Wand terminates a Baseband connection. These
steps continue the connection you established in the preceding scenario.
This procedure assumes that an ACL connection exists. See “Establish
Baseband Connection” on page 139.
Step 1
From the HCI menu, select Disconnect.
Step 2
From the HCI_Handle drop-down menu, select a handle.
Step 3
Click Execute.
For each Disconnect, you should see a return event in the Event Log that
indicates the outcome of the command.
Advertising