Gathering parts and supplies – ADS Environmental Services IETG FlowHawk QR 775012 A4 User Manual

Page 124

Advertising
background image

4-6

IETG FlowHawk Manual

network quality of service. Perform this validation before
deploying to the field and again at the monitoring site
before installing the monitor.

Gathering Parts and Supplies

Gather the following items to perform the installation:

GSM module

One of two wireless antennas available through IETG (p/n
3800-0162 or 3800-0163)

(applicable only to off-road installations) Extension cables
(4.6-m (15-foot): p/n 507165; 15.2-m (50-foot): p/n 507168)

Public Static IP address SIM card

Magnet (p/n 8000-0140)

8-millimeter anchor bolts with washers and nuts

Medium-sized non-rotating demolition hammer with a 13-mm
(0.5-in), 19-mm (0.75-in), or 25-mm (1-inch) masonry chisel
(sharpen the chisel before use) and bushing tool, or an abrasive
saw or grinder

Masonry drill bits for drilling through manhole wall, corbel,
other materials. Include the following:

 13-mm (0.5-in) diameter (minimum) x 305-mm (12-in)

long (minimum) bit

 13-mm (0.5-in) diameter x 914-mm (36-in) long

(minimum) bit

 32-mm (1.25-in) diameter x 305-mm (12-in) bit

Standard drill bits and masonry bits up to 15 millimeters (0.6
in) in diameter

Medium- to heavy-duty hammer drill (if no hammer/drill mode
is available on the demolition hammer
)

Advertising